Ongoing projects on TEDUH (official list)
237 project entries with an ongoing status are listed for Johor Bahru (315 TEDUH records). An entry is one project name, developer, licence and status. Records is the number of TEDUH records for the entry. One entry can have several records, for example separate phases or blocks.
| Project | Developer (TEDUH) | District | Licence no. | TEDUH status | Records |
|---|---|---|---|---|---|
| BANDAR TIRAM (VERBENA) | ADVANCE DEVELOPMENT SDN. BHD. | Johor Bahru | 2277/04-2028/0757(A) | Sakit (in difficulty) | 1 |
| BANDAR TIRAM (VIOLET 3) | ADVANCE DEVELOPMENT SDN. BHD. | Johor Bahru | 2277/04-2028/0757(A) | Sakit (in difficulty) | 1 |
| TAMAN BUKIT TIRAM (VIOLET 2) | ADVANCE DEVELOPMENT SDN. BHD. | Johor Bahru | 2277/04-2028/0757(A) | Sakit (in difficulty) | 1 |
| RESIDENSI AMBAR RIMBA | AFFLUENT CRAFTS SDN. BHD. | Johor Bahru | 13531/06-2030/0129(A) | Lancar (on track) | 1 |
| PANGSAPURI CENDERA 2 | AMBER LAND BERHAD | Johor Bahru | 19794/01-2029/1443(A) | Lancar (on track) | 1 |
| PANGSAPURI CENDERA 3 | AMBER LAND BERHAD | Johor Bahru | 19794/01-2029/1443(A) | Lancar (on track) | 1 |
| PUNCAK TEBRAU | AQRS THE BUILDING COMPANY SDN. BHD. | Johor Bahru | 9262/02-2028/0440(A) | Sakit (in difficulty) | 1 |
| THE FRINGE @ SERI ALAM | ASAS SAKSAMA SDN. BHD. | Johor Bahru | 30953/01-2030/0009(A) | Lancar (on track) | 2 |
| ALIVA | ASTAKA DEVELOPMENT SDN. BHD. | Johor Bahru | 30455/05-2028/0132(A) | Lancar (on track) | 1 |
| RESIDENSI AMORA | ASTAKA KIMLUN SDN. BHD. | Johor Bahru | 30969/02-2030/0025(A) | Belum Mula (not started) | 1 |
| RESIDENSI ARDEN | ASTAKA KIMLUN SDN. BHD. | Johor Bahru | 30969/02-2030/0025(A) | Lancar (on track) | 1 |
| BANDAR JAYA PUTRA | AUSTIN SENIBONG DEVELOPMENT SDN. BHD. | Johor Bahru | 19841/10-2028/1222(A) | Lancar (on track) | 4 |
| RESIDENSI TOPAZ | AUSTIN SENIBONG DEVELOPMENT SDN. BHD. | Johor Bahru | 19841/10-2028/1222(A) | Lancar (on track) | 2 |
| SOHO AURORA | AXTERIA DEVELOPMENT SDN. BHD. | Johor Bahru | 30580/10-2028/0255(A) | Lancar (on track) | 1 |
| LAMAN ESTUARI | BANDAR NUSAJAYA DEVELOPMENT SDN. BHD. | Johor Bahru | 14032/08-2027/1344(A) | Lancar (on track) | 4 |
| NADI NUSANTARA 2 | BANDAR NUSAJAYA DEVELOPMENT SDN. BHD. | Johor Bahru | 14032/08-2027/1344(A) | Lancar (on track) | 1 |
| TAMAN PULAI BESTARI | BINTANG-BINTANG DEVELOPMENT SDN.BHD | Johor Bahru | 4204/11-2028/1342(A) | Lancar (on track) | 2 |
| RESIDENSI SENIBONG MUTIARA | BLOOMING PROPERTIES SDN. BHD. | Johor Bahru | 30946/01-2030/0002(A) | Lancar (on track) | 1 |
| TAMPOI HEIGHTS | BMG GLOBAL SDN. BHD. | Johor Bahru | 12149/11-2032/0613(A) | Lancar (on track) | 1 |
| WARISAN 1 | BOUTIQUE HOUSE SDN. BHD. | Johor Bahru | 31416/06-2031/0163(A) | Belum Mula (not started) | 1 |
| BUKIT INDAH BANDAR NUSAJAYA | BUKIT INDAH (JOHOR) SDN. BHD. | Johor Bahru | 7060/02-2028/0366(A) | Lancar (on track) | 1 |
| CAPITAL CITY PROPERTY SDN BHD | CAPITAL CITY PROPERTY SDN. BHD. | Johor Bahru | 19812/11-2029/0412(A) | Belum Mula (not started) | 1 |
| CUBE 16 | CELESTIAL ACE DEVELOPMENT SDN. BHD. | Johor Bahru | 13410-2/02-2019/0154(L) | Belum Mula (not started) | 1 |
| PRESTIJ MEDINI | CENTURION (MEDINI) SDN. BHD. | Johor Bahru | 14049-1/06-2017/0583(L) | Belum Mula (not started) | 1 |
| RESIDENSI PARAGON MAPEL | CHEMPAKA LOGISTIK SDN. BHD. | Johor Bahru | 31366/04-2031/0113(A) | Belum Mula (not started) | 1 |
| LESTARI MEDINI | CJ INVESCO SDN. BHD. | Johor Bahru | 30851/09-2029/0193(A) | Lancar (on track) | 1 |
| RESIDENSI BUKIT MELDRUM | CONNOISSEUR PROPERTIES SDN. BHD. | Johor Bahru | 31015/04-2030/0071(N) | Lancar (on track) | 1 |
| CORONATION SQUARE, MENARA 3 | CORONADE PROPERTIES SDN. BHD. | Johor Bahru | 20258/05-2029/0233(A) | Lewat (delayed) | 1 |
| RUMAH MAMPU MILIK JOHOR, TAMAN NUSA SENTRAL | COUNTRY VIEW RESOURCES SDN. BHD. | Johor Bahru | 8428/12-2026/1466(A) | Lancar (on track) | 1 |
| TAMAN PUNCAK SELATAN | COUNTRYLAND REALTY SDN BHD | Johor Bahru | 4919/02-2029/1546(A) | Lancar (on track) | 1 |
| RESIDENSI ION | CREED PROPERTY MALAYSIA SDN. BHD. | Johor Bahru | 30949/01-2030/0005(A) | Lancar (on track) | 1 |
| BANDAR CEMERLANG (PRESINT J1) | CRESCENDO DEVELOPMENT SDN. BHD. | Johor Bahru | 5887/10-2028/1303(A) | Lancar (on track) | 1 |
| DESA CEMERLANG | CRESCENDO DEVELOPMENT SDN. BHD. | Johor Bahru | 5887/10-2028/1303(A) | Lancar (on track) | 1 |
| RESIDENSI SENYUM | CRESCENDO LANDMARK SDN. BHD. | Johor Bahru | 30797/06-2029/0139(A) | Lancar (on track) | 1 |
| RESIDENSI OASIS | CTC DEVELOPMENT MALAYSIA SDN. BHD. | Johor Bahru | 30524/08-2028/0201(A) | Lancar (on track) | 1 |
| RESIDENSI SKYONE | CTC SKYLINE DEVELOPMENT SDN. BHD. | Johor Bahru | 31141/08-2030/0197(A) | Lancar (on track) | 1 |
| JADE PALACE | DANGA JED DEVELOPMENT MALAYSIA SDN. BHD. | Johor Bahru | 13861/09-2027/1080(A) | Lancar (on track) | 1 |
| THE RIDGE @ AUSTIN HEIGHTS, TAMAN MOUNT AUSTIN | DETIK HARTAMAS SDN. BHD. | Johor Bahru | 11690/06-2028/0246(A) | Lancar (on track) | 1 |
| RESIDENSI ANGGUN MEWAH | DSARA SENTRAL SDN. BHD. | Johor Bahru | 9600/09-2033/0428(R) | Lancar (on track) | 2 |
| TWIN TOWER @ PONDEROSA | EBONY BOUNTY SDN. BHD. | Johor Bahru | 13245-1/10-2015/0788(L) | Belum Mula (not started) | 1 |
| PRESINT BOTANI 2 | ECO BOTANIC 3 SDN. BHD. | Johor Bahru | 31135/08-2030/0191(A) | Lancar (on track) | 1 |
| PRESINT 2 | ECO BOTANIC SDN. BHD. | Johor Bahru | 14020/12-2027/1475(A) | Lancar (on track) | 1 |
| RESIDENSI KOMERSIAL BOTANI SAYANG | ECO BOTANIC SDN. BHD. | Johor Bahru | 14020/12-2027/1475(A) | Lancar (on track) | 1 |
| EKOFLORA 2 | ECO SUMMER SDN. BHD. | Johor Bahru | 14320/02-2029/1556(A) | Belum Mula (not started) | 2 |
| EKOFLORA 2 | ECO SUMMER SDN. BHD. | Johor Bahru | 14320/02-2029/1556(A) | Lancar (on track) | 2 |
| EKOFLORA 4 | ECO SUMMER SDN. BHD. | Johor Bahru | 14320/02-2029/1556(A) | Lancar (on track) | 2 |
| FLORA DWIPUNCAK SANTAI | ECO SUMMER SDN. BHD. | Johor Bahru | 14320/02-2029/1556(A) | Lancar (on track) | 1 |
| FLORA SANTAI | ECO SUMMER SDN. BHD. | Johor Bahru | 14320/02-2029/1556(A) | Lancar (on track) | 1 |
| FLORA SANTAI TIGA | ECO SUMMER SDN. BHD. | Johor Bahru | 14320/02-2029/1556(A) | Lancar (on track) | 1 |
| EKOTROPIKA 10 | ECO TROPICS DEVELOPMENT SDN. BHD. | Johor Bahru | 6443/06-2027/0346(A) | Lancar (on track) | 4 |
| EKOTROPIKA 9 | ECO TROPICS DEVELOPMENT SDN. BHD. | Johor Bahru | 6443/06-2027/0346(A) | Belum Mula (not started) | 2 |
| KOTA MASAI | ECO TROPICS DEVELOPMENT SDN. BHD. | Johor Bahru | 6443/06-2027/0346(A) | Belum Mula (not started) | 1 |
| LAMAN INDAH 3 | ECO TROPICS DEVELOPMENT SDN. BHD. | Johor Bahru | 6443/06-2027/0346(A) | Lancar (on track) | 2 |
| RESIDENSI KEBUN TEH (THE ASTERIAZ @ KEBUN TEH) | EXSIM KEBUN TEH SDN. BHD. | Johor Bahru | 31007/03-2030/0063(A) | Lancar (on track) | 1 |
| RESIDENSI KEBUN TEH DUA (THE CELESTZ @ KEBUN TEH) | EXSIM KEBUN TEH SDN. BHD. | Johor Bahru | 31007/03-2030/0063(A) | Belum Mula (not started) | 1 |
| RESIDENSI DATARAN SELATAN (AXIS TOWER) | EXSIM LUMBA KUDA SDN. BHD. | Johor Bahru | 31100/07-2030/0156(A) | Lancar (on track) | 1 |
| RESIDENSI DATARAN SELATAN (BRIXTON TOWER) | EXSIM LUMBA KUDA SDN. BHD. | Johor Bahru | 31100/07-2030/0156(A) | Lancar (on track) | 1 |
| RESIDENSI DATARAN SELATAN (COVEN TOWER) | EXSIM LUMBA KUDA SDN. BHD. | Johor Bahru | 31100/07-2030/0156(A) | Lancar (on track) | 1 |
| RESIDENSI DATARAN SELATAN (DOVER TOWER) | EXSIM LUMBA KUDA SDN. BHD. | Johor Bahru | 31100/07-2030/0156(A) | Lancar (on track) | 1 |
| RESIDENSI KAZE | FAR EAST (ULU TIRAM) SDN. BHD. | Johor Bahru | 20120/10-2028/1251(A) | Lancar (on track) | 1 |
| RESIDENSI SARI HIJAU I | FAR EAST NUSAJAYA SDN. BHD. | Johor Bahru | 30966/02-2030/0022(N) | Lancar (on track) | 1 |
| RESIDENSI BESTARI RIA | GANTANG JAYA SDN. BHD. | Johor Bahru | 12438/08-2028/0371(A) | Lancar (on track) | 1 |
| TAMAN PULAI UTAMA | GLOBAL EARNEST SDN. BHD. | Johor Bahru | 7360/06-2028/1361(R) | Belum Mula (not started) | 1 |
| PUNCAK LEGENDA | GOLDMOUNT RESOURCES SDN. BHD. | Johor Bahru | 10351/05-2025/1044(R) | Lancar (on track) | 1 |
| ELEMENCE-CELIA (TAMAN DENAI ALAM) | GRAND VIEW REALTY SDN. BHD. | Johor Bahru | 19148/02-2029/0049(A) | Lancar (on track) | 1 |
| GRANDEUR PARK SDN BHD | GRANDEUR PARK SDN. BHD. | Johor Bahru | 8154-33/06-2020/02035(L) | Belum Mula (not started) | 1 |
| TAMAN PULAI INDAH | GRANDEUR PARK SDN. BHD. | Johor Bahru | 8154-33/06-2020/02035(L) | Belum Mula (not started) | 1 |
| PETRIE VILLA | GUGUSAN MURNI SDN. BHD. | Johor Bahru | 13420/06-2027/0251(R) | Lancar (on track) | 1 |
| LAMAN IMPIAN EMAS DUA | GUNUNG IMPIAN DEVELOPMENT SDN. BHD. | Johor Bahru | 7228/03-2029/0080(A) | Lancar (on track) | 1 |
| TAMAN IMPIAN EMAS (BUKIT IMPIAN RESIDENCE) | GUNUNG IMPIAN DEVELOPMENT SDN. BHD. | Johor Bahru | 7228/03-2029/0080(A) | Lancar (on track) | 1 |
| TAMAN IMPIAN EMAS (HONEYDALE RESIDENCE) | GUNUNG IMPIAN DEVELOPMENT SDN. BHD. | Johor Bahru | 7228/03-2029/0080(A) | Lancar (on track) | 2 |
| TAMAN IMPIAN EMAS (ICONIA GARDEN RESIDENCE) | GUNUNG IMPIAN DEVELOPMENT SDN. BHD. | Johor Bahru | 7228/03-2029/0080(A) | Lancar (on track) | 4 |
| PERUMAHAN ISKANDAR PUTERI BANGSA JOHOR | HARTA NUSAJAYA SDN. BHD. | Johor Bahru | 30818/07-2029/0160(A) | Lancar (on track) | 3 |
| EMERALD BAY | HAUTE PROPERTY SDN. BHD. | Johor Bahru | 12446/01-2029/0244(R) | Lancar (on track) | 1 |
| HORIZON HILLS | HORIZON HILLS DEVELOPMENT SDN. BHD. | Johor Bahru | 10316/01-2028/0240(A) | Belum Mula (not started) | 2 |
| AUSTIN DUTA | IJM PROPERTIES SDN. BHD. | Johor Bahru | 8326/03-2028/0569(A) | Lancar (on track) | 3 |
| AUSTIN DUTA | IJM PROPERTIES SDN. BHD. | Johor Bahru | 8326/03-2028/0569(A) | Lewat (delayed) | 2 |
| RESIDENSI RIMBA | ISKANDAR DEVELOPMENT MANAGEMENT SERVICES SDN. BHD. | Johor Bahru | 30898/10-2029/0241(N) | Lancar (on track) | 1 |
| BANDAR DATO ONN, PERJIRANAN 8 | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Lancar (on track) | 1 |
| BANDAR DATO ONN, PERJIRANAN 8 ( MAPLE 2B) | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Lancar (on track) | 1 |
| BANDAR DATO' ONN, PERJIRANAN 13 | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Lancar (on track) | 1 |
| BANDAR TIRAM 3 | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Lancar (on track) | 1 |
| BANDAR TIRAM 3 (50 UNIT) | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Lancar (on track) | 1 |
| EASTWOOD | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Belum Mula (not started) | 1 |
| KESUMA | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Lancar (on track) | 1 |
| RMMJ TIRAM HARMONI (PTD 212243-PTD 212311) | JLG LAND BERHAD | Johor Bahru | 8918/10-2028/1240(A) | Lancar (on track) | 1 |
| CUMULUS 3 BANDAR LAYANGKASA | JMC CAHAYA SDN. BHD. | Johor Bahru | 19437/08-2028/0318(R) | Lancar (on track) | 1 |
| RESIDENSI DAYA 1 | KECK SENG (MALAYSIA) BERHAD | Johor Bahru | 2823/07-2028/0929(A) | Lancar (on track) | 1 |
| TAMAN DAYA | KECK SENG (MALAYSIA) BERHAD | Johor Bahru | 2823/07-2028/0929(A) | Lancar (on track) | 1 |
| TANJUNG PUTERI RESORT | KECK SENG (MALAYSIA) BERHAD | Johor Bahru | 2823/07-2028/0929(A) | Lancar (on track) | 2 |
| TAMAN BUKIT AMBER | KEMAJUAN TONG TOR SDN.BHD. | Johor Bahru | 8316/08-2027/0756(A) | Lancar (on track) | 3 |
| TAMAN LAMAN SETIA | KESAS KENANGAN SDN. BHD. | Johor Bahru | 10611/03-2028/0340(A) | Lancar (on track) | 2 |
| TAMAN LAMAN SETIA (CARISSA 1) | KESAS KENANGAN SDN. BHD. | Johor Bahru | 10611/03-2028/0340(A) | Lancar (on track) | 1 |
| TAMAN LAMAN SETIA (EUGENIA 1) | KESAS KENANGAN SDN. BHD. | Johor Bahru | 10611/03-2028/0340(A) | Lancar (on track) | 1 |
| HIJAUAN KEWS | KEWS SENIBONG SDN. BHD. | Johor Bahru | 30871/09-2029/0214(A) | Lancar (on track) | 2 |
| RIMBAYU KEWS | KEWS SENIBONG SDN. BHD. | Johor Bahru | 30871/09-2029/0214(A) | Lancar (on track) | 2 |
| PANGSAPURI KEMPAS INDAH 2 (D' SECRET GARDEN 2) | KHOO SOON LEE REALTY SDN. BHD. | Johor Bahru | 3390/03-2029/0030(A) | Lancar (on track) | 2 |
| RESIDENSI ALAM PERMAI | KHOO SOON LEE REALTY SDN. BHD. | Johor Bahru | 3390/03-2029/0030(A) | Lancar (on track) | 1 |
| TAMAN BESTARI INDAH | KHOO SOON LEE REALTY SDN. BHD. | Johor Bahru | 3390/03-2029/0030(A) | Belum Mula (not started) | 1 |
| TAMAN BESTARI INDAH | KHOO SOON LEE REALTY SDN. BHD. | Johor Bahru | 3390/03-2029/0030(A) | Lancar (on track) | 1 |
| TAMAN BESTARI INDAH 1 (FASA 4) | KHOO SOON LEE REALTY SDN. BHD. | Johor Bahru | 3390/03-2029/0030(A) | Belum Mula (not started) | 1 |
| TAMAN MUTIARA BESTARI | KHOO SOON LEE REALTY SDN. BHD. | Johor Bahru | 3390/03-2029/0030(A) | Lancar (on track) | 1 |
| TAMAN NUSA BESTARI 2 (FASA 5) | KHOO SOON LEE REALTY SDN. BHD. | Johor Bahru | 3390/03-2029/0030(A) | Belum Mula (not started) | 1 |
| RESIDENSI KOMERSIAL ALMA IDAMAN | KSL DEVELOPMENT SDN. BHD. | Johor Bahru | 7777/03-2028/0353(A) | Lancar (on track) | 1 |
| LEISURE FARM RESORT | LEISURE FARM CORPORATION SDN.BHD. | Johor Bahru | 7165/07-2032/0239(R) | Lancar (on track) | 1 |
| LEISURE FARM RESORT-LINK 25 | LEISURE FARM CORPORATION SDN.BHD. | Johor Bahru | 7165/07-2032/0239(R) | Belum Mula (not started) | 1 |
| PUNCAK PREMIUM | LEVERAGE GLOBAL SDN. BHD. | Johor Bahru | 30496/07-2028/0173(A) | Belum Mula (not started) | 1 |
| PUNCAK PREMIUM | LEVERAGE GLOBAL SDN. BHD. | Johor Bahru | 30496/07-2028/0173(A) | Lancar (on track) | 2 |
| SKYPARK KEPLER | LIDO WATERFRONT BOULEVARD SDN. BHD. | Johor Bahru | 10843/12-2031/0559(R) | Lancar (on track) | 1 |
| TAMAN MUTIARA HIJAU | LIM KENG SIANG SDN. BHD. | Johor Bahru | 13856-1/01-2018/01195(L) | Belum Mula (not started) | 1 |
| RESIDENSI MUTIARA AUSTIN | LINTANG HEBAT SDN. BHD. | Johor Bahru | 30292/11-2027/0291(A) | Lancar (on track) | 2 |
| PTD 2955 | MAHABUILDERS SDN. BHD. | Johor Bahru | 8259-16/04-2017/491 | Lancar (on track) | 1 |
| RESIDENSI GEN | MAJESTIC GEN SDN. BHD. | Johor Bahru | 30828/08-2029/0170(A) | Lancar (on track) | 1 |
| RESIDENSI GEN SFERA | MAJESTIC GEN SDN. BHD. | Johor Bahru | 30828/08-2029/0170(A) | Lancar (on track) | 1 |
| RESIDENSI MAXIM PELANGI | MAXIM PELANGI SDN. BHD. | Johor Bahru | 31074/06-2030/0130(A) | Lancar (on track) | 1 |
| RESIDENSI MASAI | MAYLAND PROJECTS (JOHOR) SDN. BHD. | Johor Bahru | 11703/09-2027/0911(A) | Lancar (on track) | 1 |
| VISTA TIARA | MB WORLD PROPERTIES SDN. BHD. | Johor Bahru | 30688/02-2029/0030(A) | Lancar (on track) | 1 |
| VISTA TIARA 1 | MB WORLD PROPERTIES SDN. BHD. | Johor Bahru | 30688/02-2029/0030(A) | Lancar (on track) | 1 |
| RESIDENSI PUNCAK SAUJANA | MBW CITY SDN. BHD. | Johor Bahru | 20101/04-2028/0598(A) | Lewat (delayed) | 1 |
| RESIDENSI PERBADANAN ISLAM TELUK PERMATA | MBW COVE SDN. BHD. | Johor Bahru | 30588/10-2028/0263(A) | Lancar (on track) | 1 |
| RESIDENSI PERMATA INDAH | MBW COVE SDN. BHD. | Johor Bahru | 30588/10-2028/0263(A) | Lancar (on track) | 1 |
| RESIDENSI PERMATA INDAH 2 | MBW COVE SDN. BHD. | Johor Bahru | 30588/10-2028/0263(A) | Lancar (on track) | 1 |
| TAMAN TELUK PERMATA | MBW COVE SDN. BHD. | Johor Bahru | 30588/10-2028/0263(A) | Sakit (in difficulty) | 1 |
| LAMAN PERDANA | MEDINI HERITAGE SDN. BHD. | Johor Bahru | 20251/03-2027/0069(A) | Lancar (on track) | 1 |
| TAMAN PERDANA TIONG NAM (FASA 1B3) | MEDINI HERITAGE SDN. BHD. | Johor Bahru | 20251/03-2027/0069(A) | Lancar (on track) | 1 |
| RESIDENSI BOTANI 3 | MELIA SPRING SDN. BHD. | Johor Bahru | 19985/01-2029/1478(A) | Lancar (on track) | 2 |
| RESIDENSI KOMERSIAL BOTANI SAYANG 2 | MELIA SPRING SDN. BHD. | Johor Bahru | 19985/01-2029/1478(A) | Lancar (on track) | 1 |
| RESIDENSI KOMERSIAL BOTANI SAYANG 3 | MELIA SPRING SDN. BHD. | Johor Bahru | 19985/01-2029/1478(A) | Lancar (on track) | 1 |
| ALLAMANDA 3 | MERIDIN EAST SDN. BHD. | Johor Bahru | 14297/12-2028/1380(A) | Lancar (on track) | 1 |
| MERIDIN EAST JASMINE 2 | MERIDIN EAST SDN. BHD. | Johor Bahru | 14297/12-2028/1380(A) | Lancar (on track) | 1 |
| MERIDIN EAST PARCEL 4A4 | MERIDIN EAST SDN. BHD. | Johor Bahru | 14297/12-2028/1380(A) | Lancar (on track) | 1 |
| MERIDIN EAST PARCEL 4A5 | MERIDIN EAST SDN. BHD. | Johor Bahru | 14297/12-2028/1380(A) | Lancar (on track) | 1 |
| MERIDIN EAST PARCEL 4A6 | MERIDIN EAST SDN. BHD. | Johor Bahru | 14297/12-2028/1380(A) | Lancar (on track) | 1 |
| SKIM PERUMAHAN MAMPU MILIK BESTARI PERDANA 2 | MERIDIN EAST SDN. BHD. | Johor Bahru | 14297/12-2028/1380(A) | Lancar (on track) | 2 |
| SKIM PERUMAHAN MAMPU MILIK TAMAN BESTARI PERDANA 2 | MERIDIN EAST SDN. BHD. | Johor Bahru | 14297/12-2028/1380(A) | Lancar (on track) | 2 |
| MERLION GATEWAY SDN BHD | MERLION GATEWAY SDN. BHD. | Johor Bahru | 13072-1/06-2015/0266(L) | Belum Mula (not started) | 1 |
| RESIDENSI AETHERA | MIDTOWN SANCTUARY SDN. BHD. | Johor Bahru | 31157/09-2030/0213(A) | Lancar (on track) | 1 |
| RESIDENSI ANGGUN | MS LAKECITY SDN. BHD. | Johor Bahru | 30440/05-2028/0117(A) | Lancar (on track) | 3 |
| PANGSAPURI SAUJANA INDAH | MULTI COURT DEVELOPERS SDN. BHD. | Johor Bahru | 19398/01-2029/1573(A) | Lancar (on track) | 2 |
| RINI HIILLS 3 | MUTIARA RINI SDN. BHD. | Johor Bahru | 6737/10-2027/1245(A) | Lancar (on track) | 1 |
| RINI HILLS 3 | MUTIARA RINI SDN. BHD. | Johor Bahru | 6737/10-2027/1245(A) | Lancar (on track) | 2 |
| DESA PALMA | NASA LAND SDN. BHD. | Johor Bahru | 10241/07-2028/1051(A) | Lancar (on track) | 3 |
| LARKIN RESIDENCE | NICHE PROPERTIES SDN. BHD. | Johor Bahru | 9341/11-2026/0229(R) | Belum Mula (not started) | 1 |
| TAMAN SELESA INDAH | NUSA UTAMA SDN. BHD. | Johor Bahru | 7576/10-2027/1126(A) | Lancar (on track) | 1 |
| GERBANG NUSAJAYA | NUSAJAYA RISE SDN. BHD. | Johor Bahru | 14228/02-2029/1559(A) | Lancar (on track) | 3 |
| LAMAN TASIK ASPIRA | NUSAJAYA RISE SDN. BHD. | Johor Bahru | 14228/02-2029/1559(A) | Lancar (on track) | 2 |
| PONDEROSA VISTA ZON 2F | PANDAN BARU SDN. BHD. | Johor Bahru | 9333/11-2027/0188(A) | Lancar (on track) | 1 |
| RUMAH BANDAR DATO' CHELLAM | PANORAMIC JAYA SDN. BHD. | Johor Bahru | 11940/05-2027/0814(A) | Belum Mula (not started) | 1 |
| RUMAH BANDAR PALMA KIPAS | PANORAMIC JAYA SDN. BHD. | Johor Bahru | 11940/05-2027/0814(A) | Lewat (delayed) | 1 |
| RUMAH BANDAR PALMA RAFIS | PANORAMIC JAYA SDN. BHD. | Johor Bahru | 11940/05-2027/0814(A) | Lewat (delayed) | 1 |
| BAYU PUTERI MARINA | PARADISE REALTY SDN. BHD. | Johor Bahru | 9222/11-2028/0282(A) | Lancar (on track) | 1 |
| SURIA PARAGON | PARAGON PREMIUM SDN. BHD. | Johor Bahru | 30435/05-2028/0112(A) | Lancar (on track) | 2 |
| SUITE PREMIUM PARAGON | PARAGON URBAN SDN. BHD. | Johor Bahru | 30917/11-2029/0260(A) | Lancar (on track) | 1 |
| BANDAR LAYANGKASA | PARKLAND CITY SDN. BHD. | Johor Bahru | 13759/12-2028/1356(A) | Lancar (on track) | 2 |
| RUMAH BANDAR LAYANGKASA LOT 232276 & RUMAH BANDAR LAYANGKASA LOT 232277 | PARKLAND CITY SDN. BHD. | Johor Bahru | 13759/12-2028/1356(A) | Lancar (on track) | 1 |
| RUMAH BANDAR LAYANGKASA LOT 232278 & RUMAH BANDAR LAYANGKASA LOT 232279 | PARKLAND CITY SDN. BHD. | Johor Bahru | 13759/12-2028/1356(A) | Lancar (on track) | 1 |
| RESIDENSI PARKLAND PERMAS | PARKLAND SOUTHERN SDN. BHD. | Johor Bahru | 30635/12-2028/0310(A) | Lancar (on track) | 2 |
| RESIDENSI SAUJANA | PARKWOOD PALMS SDN. BHD. | Johor Bahru | 19932/07-2027/0876(A) | Lancar (on track) | 1 |
| TAMAN GEMILANG | PECK SEONG REALTY SDN. BHD. | Johor Bahru | 3322/05-2029/0090(R) | Belum Mula (not started) | 1 |
| RESIDENSI CAMAR | PELANGI SDN. BHD. | Johor Bahru | 673/06-2028/1427(A) | Lancar (on track) | 1 |
| TAMAN PERLING | PELANGI SDN. BHD. | Johor Bahru | 673/06-2028/1427(A) | Lancar (on track) | 1 |
| RESIDENSI DWI PESONA | PERMAS JAYA SDN. BHD. | Johor Bahru | 835/03-2027/0201(A) | Lancar (on track) | 1 |
| RESIDENSI SUASANA PERMAS | PERMAS JAYA SDN. BHD. | Johor Bahru | 835/03-2027/0201(A) | Lancar (on track) | 1 |
| RIMBUNAN | PERMAS JAYA SDN. BHD. | Johor Bahru | 835/03-2027/0201(A) | Lancar (on track) | 1 |
| RESIDENSI DANGA PARAGON 1 | PGB DESA HEIGHTS SDN. BHD. | Johor Bahru | 31149/09-2030/0205(A) | Lancar (on track) | 1 |
| TAMAN SENI ALAM | PH WORLD PROPERTY SDN. BHD. | Johor Bahru | 10117/09-2027/1050(A) | Lancar (on track) | 1 |
| RESIDENSI PINEGATE | PINEGATE DEVELOPMENT SDN. BHD. | Johor Bahru | 30680/01-2029/0022(A) | Lancar (on track) | 2 |
| SKYLINE ONE SENTOSA | PLAZA SENTOSA PROPERTIES SDN. BHD. | Johor Bahru | 31031/05-2030/0087(A) | Lancar (on track) | 1 |
| RMMJ P18 TAMAN DESA TEBRAU | PLENITUDE TEBRAU SDN. BHD. | Johor Bahru | 6418/11-2028/1459(A) | Belum Mula (not started) | 1 |
| TAMAN DESA TEBRAU - 4A | PLENITUDE TEBRAU SDN. BHD. | Johor Bahru | 6418/11-2028/1459(A) | Lancar (on track) | 1 |
| TAMAN DESA TEBRAU - 8E (1) | PLENITUDE TEBRAU SDN. BHD. | Johor Bahru | 6418/11-2028/1459(A) | Lancar (on track) | 1 |
| TAMAN DESA TEBRAU - 8E (2) | PLENITUDE TEBRAU SDN. BHD. | Johor Bahru | 6418/11-2028/1459(A) | Lancar (on track) | 1 |
| RESIDENSI PONDEROSA | PRINSIP ALPHA SDN. BHD. | Johor Bahru | 30684/01-2029/0026(A) | Lancar (on track) | 1 |
| BANDAR PUTRA FASA 1 ZON 1D04 | PROPERTY VILLAGE BERHAD | Johor Bahru | 6089/07-2027/0944(A) | Lancar (on track) | 1 |
| BANDAR PUTRA FASA 2C01 BAHAGIAN 1 | PROPERTY VILLAGE BERHAD | Johor Bahru | 6089/07-2027/0944(A) | Belum Mula (not started) | 1 |
| RESIDENSI PUNCAK AUSTIN | PROSPER PLUS INDUSTRY SDN. BHD. | Johor Bahru | 13457/09-2030/0351(R) | Lancar (on track) | 1 |
| TAMAN GANGGA AYU | PULAI SPRINGS RESORT BERHAD. | Johor Bahru | 5975/10-2028/0445(R) | Lancar (on track) | 1 |
| MERCU 3, R&F TANJUNG PUTERI | R & F DEVELOPMENT SDN BHD | Johor Bahru | 13578/05-2027/0392(A) | Lancar (on track) | 3 |
| TAMAN BUKIT SURIA | RA SURIA SDN. BHD. | Johor Bahru | 20206/12-2026/1389(A) | Lancar (on track) | 1 |
| TAMAN REDANG | RAWHIDE SDN. BHD. | Johor Bahru | 6866/10-2033/0532(R) | Lancar (on track) | 1 |
| TAMAN IMPIAN JAYA, SENAI | RIO DULCE HOLDINGS SDN. BHD. | Johor Bahru | 19911/06-2029/0245(R) | Lancar (on track) | 1 |
| PANGSAPURI PULAI DUTA 1 | SCIENTEX QUATARI SDN. BHD. | Johor Bahru | 9294/04-2028/0739(A) | Lancar (on track) | 1 |
| PANGSAPURI PULAI DUTA 2 | SCIENTEX QUATARI SDN. BHD. | Johor Bahru | 9294/04-2028/0739(A) | Lancar (on track) | 1 |
| TAMAN PULAI DUTA | SCIENTEX QUATARI SDN. BHD. | Johor Bahru | 9294/04-2028/0739(A) | Lancar (on track) | 3 |
| TAMAN PULAI DUTA 2 | SCIENTEX QUATARI SDN. BHD. | Johor Bahru | 9294/04-2028/0739(A) | Belum Mula (not started) | 1 |
| TAMAN PULAI DUTA 2 | SCIENTEX QUATARI SDN. BHD. | Johor Bahru | 9294/04-2028/0739(A) | Lancar (on track) | 3 |
| TAMAN TANJUNG PUTERI RESORT | SCUDAI DEVELOPMENT SDN. BHD. | Johor Bahru | 8095/12-2028/1468(A) | Lancar (on track) | 1 |
| TANJUNG PUTERI RESORT | SCUDAI DEVELOPMENT SDN. BHD. | Johor Bahru | 8095/12-2028/1468(A) | Lancar (on track) | 1 |
| ALUNAN SENIBONG | SENIBONG COVE DEVELOPMENT SDN. BHD. | Johor Bahru | 11115/01-2028/0274(A) | Lancar (on track) | 1 |
| LAGUN SENIBONG | SENIBONG COVE DEVELOPMENT SDN. BHD. | Johor Bahru | 11115/01-2028/0274(A) | Lancar (on track) | 1 |
| RESIDENSI PANORAMA SENIBONG | SENIBONG HILLS SDN BHD | Johor Bahru | 14523/08-2028/1047(A) | Lancar (on track) | 1 |
| BANDAR SERI ALAM | SERI ALAM PROPERTIES SDN. BHD. | Johor Bahru | 3778/12-2030/0558(R) | Belum Mula (not started) | 1 |
| BANDAR SERI ALAM | SERI ALAM PROPERTIES SDN. BHD. | Johor Bahru | 3778/12-2030/0558(R) | Lancar (on track) | 2 |
| FASA 3C2 | SERI ALAM PROPERTIES SDN. BHD. | Johor Bahru | 3778/12-2030/0558(R) | Belum Mula (not started) | 1 |
| LAMAN ALUVIUM | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 2 |
| LAMAN BUKIT | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 1 |
| LAMAN DANAU | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 1 |
| PANGSAPURI SETIA IMPIANA | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 1 |
| RESIDENSI LILI 1 , RESIDENSI LILI 2 , RESIDENSI LILI 3 & RESIDENSI LILI 4 | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 1 |
| SAPPHIRE ÉLAN | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 1 |
| SRI SENJA & SRI EMBUN | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 1 |
| SUMMERA GROVE | SETIA INDAH SDN. BHD. | Johor Bahru | 8118/04-2028/0567(A) | Lancar (on track) | 1 |
| SINCERE WORLD LAND & DEVELOPMENT SDN. BHD. | SINCERE WORLD LAND & DEVELOPMENT SDN. BHD. | Johor Bahru | 13829/12-2026/0420(R) | Belum Mula (not started) | 1 |
| SKUDAI PARADE APARTMEN 2 | SINEO HOTEL SDN. BHD. | Johor Bahru | 8306-1/11-2018/02763(L) | Belum Mula (not started) | 1 |
| RESIDENSI SINARAN | SOLUSI KELANA SDN. BHD. | Johor Bahru | 20031/01-2028/1373(A) | Lancar (on track) | 1 |
| RESIDENSI NADI SOUTHKEY | SOUTHKEY CITY SDN. BHD. | Johor Bahru | 13119/10-2027/1279(A) | Lancar (on track) | 1 |
| TAMAN NUSA MELATI | SUN SAKURA SDN. BHD. | Johor Bahru | 30601/10-2028/0276(A) | Lancar (on track) | 1 |
| FASA 6 | SUNWAY CITY (JB) SDN. BHD. | Johor Bahru | 13096/12-2027/0041(A) | Lancar (on track) | 1 |
| KONDOMINIUM SUNWAY BUKIT LENANG | SUNWAY CITY (JB) SDN. BHD. | Johor Bahru | 13096/12-2027/0041(A) | Lancar (on track) | 1 |
| LAMAN SUNWAY 6 | SUNWAY ISKANDAR DEVELOPMENT SDN. BHD. | Johor Bahru | 30747/04-2029/0089(N) | Lancar (on track) | 1 |
| SOHO SUNWAY MAJESTIC | SUNWAY MAJESTIC SDN. BHD. | Johor Bahru | 31034/05-2030/0090(A) | Lancar (on track) | 1 |
| LAMAN SUNWAY 1 | SUNWAY PARKVIEW SDN. BHD. | Johor Bahru | 20231/01-2029/1506(A) | Lancar (on track) | 3 |
| SAKURA | SUNWAY SAKURA DEVELOPMENT SDN. BHD. | Johor Bahru | 14633/05-2027/1164(A) | Lancar (on track) | 1 |
| TAMAN RINTING | TAMAN GUNONG HIJAU SDN. BHD. | Johor Bahru | 2387/12-2027/0183(A) | Lancar (on track) | 4 |
| ALAM SUTERA | TANAH SUTERA DEVELOPMENT SDN. BHD. | Johor Bahru | 6034/08-2033/0247(R) | Lancar (on track) | 3 |
| PANGSAPURI SUTERA | TANAH SUTERA DEVELOPMENT SDN. BHD. | Johor Bahru | 6034/08-2033/0247(R) | Lancar (on track) | 2 |
| PINE 62 | TANJUNG BINTANG SDN. BHD. | Johor Bahru | 4778/05-2027/1497(A) | Lancar (on track) | 1 |
| NUSA DUTA | TARIKAN ABADI SDN. BHD. | Johor Bahru | 10919/09-2030/0496(A) | Lancar (on track) | 1 |
| NOVA SUITES | TASEK HOMES SDN. BHD. | Johor Bahru | 11381/02-2028/0352(R) | Belum Mula (not started) | 1 |
| SOLARIS TEBRAU | TH TEBRAU LAND SDN. BHD. | Johor Bahru | 19642/03-2032/0099(A) | Lancar (on track) | 1 |
| RESIDENSI TIARA CEMERLANG 1 | TIARA CEMERLANG SDN. BHD. | Johor Bahru | 30981/03-2030/0037(A) | Lancar (on track) | 1 |
| RESIDENSI TIARA CEMERLANG 2 | TIARA CEMERLANG SDN. BHD. | Johor Bahru | 30981/03-2030/0037(A) | Lancar (on track) | 1 |
| RESIDENSI TIARA CEMERLANG 3 | TIARA CEMERLANG SDN. BHD. | Johor Bahru | 30981/03-2030/0037(A) | Lancar (on track) | 1 |
| MEADOW HEIGHTS | TILAND DEVELOPMENT SDN. BHD. | Johor Bahru | 30922/11-2029/0265(A) | Lancar (on track) | 1 |
| PANGSAPURI SENAI 2 | TRILLION PARADISE SDN. BHD. | Johor Bahru | 14684-1/03-2019/0236(L) | Belum Mula (not started) | 1 |
| RESIDENSI MUTIARA | UDA LAND (SOUTH) SDN. BHD. | Johor Bahru | 8971/11-2027/1089(A) | Lancar (on track) | 1 |
| PUSAT KOMERSIAL TASIK MEDINI | UMLAND MEDINI LAKESIDE DEVELOPMENT SDN. BHD. | Johor Bahru | 19488/09-2025/1359(R) | Sakit (in difficulty) | 1 |
| TAMAN TIARA INDAH | VENICE VIEW DEVELOPMENT SDN. BHD. | Johor Bahru | 10279/07-2032/0264(A) | Lancar (on track) | 3 |
| TAMAN TIARA INDAH (M TIARA) | VENICE VIEW DEVELOPMENT SDN. BHD. | Johor Bahru | 10279/07-2032/0264(A) | Lancar (on track) | 1 |
| RESIDENSI DANAU UTAMA | VIP BEYOND SDN. BHD. | Johor Bahru | 14641/07-2027/1112(A) | Lancar (on track) | 1 |
| VIRIDEA SERVICED RESIDENCE | VIRIDEA LAKESIDE SDN. BHD. | Johor Bahru | 13977/07-2029/0413(R) | Belum Mula (not started) | 1 |
| BANDAR WAWARI | WAWARI SDN. BHD. | Johor Bahru | 31063/06-2030/0119(A) | Belum Mula (not started) | 2 |
| BANDAR WAWARI | WAWARI SDN. BHD. | Johor Bahru | 31063/06-2030/0119(A) | Lancar (on track) | 2 |
| RESIDENSI KOMERSIAL PINGGIRAN SUNGAI | WAWARI SDN. BHD. | Johor Bahru | 31063/06-2030/0119(A) | Lancar (on track) | 2 |
| ADISON | WCT GREEN SDN. BHD. | Johor Bahru | 30376/02-2028/0053(A) | Lancar (on track) | 5 |
| RESIDENSI IDAMAN NOVA | WEALTHY GROWTH SDN. BHD. | Johor Bahru | 10713/04-2027/1078(A) | Lancar (on track) | 1 |
| TAMAN PELANGI INDAH | YUKONG DEVELOPMENT (PTE) LIMITED | Johor Bahru | 7180/12-2027/1202(A) | Lancar (on track) | 1 |
Status labels are TEDUH's own (Malay). Our English gloss: Lancar = on track; Lewat = delayed; Belum Mula = not started; Sakit = in difficulty. TEDUH gives no completion dates, so none is shown here. Source: TEDUH, Senarai Projek Berlesen (Jabatan Perumahan Negara). TEDUH data updated to 9 Nov 2026; checked 10 Nov 2026.
Candidate projects from listings and media (not verified)
36 candidate project(s) found so far for Johor Bahru. Dates come from listings and media. Malaysian completion dates often move, so check with the developer before you plan the move.
| Project | Developer (as reported) | Location | Units | Expected TOP (as reported) | Status |
|---|---|---|---|---|---|
| MBW Bay (Phase 1) | MB World Group (subsidiary) | Danga Bay, Johor Bahru | 388 (Phase 1: Towers 7 and 8, Florian Residences) | Phase 1 keys presented 9 Dec 2025. Phase 2 end-2026, Phase 3 2027 (as reported) | Not verified by an official source. The Star (15 Dec 2025) and EdgeProp.my (12 Dec 2025). TEDUH lists Vista Tiara as Lancar (ongoing). Checked 10 Nov 2026 |
| Quayside JBCC | Bangsar Heights Development | JB City Centre | 482 | Q4 2026 (listing; confirm with developer) | Not verified. No Johor entry with this name on TEDUH. |
| Pangsapuri Saujana Indah | MGB | Molek, Johor Bahru | Not stated | Topping out done; completion not stated | Not verified. TEDUH lists PANGSAPURI SAUJANA INDAH (Johor Bahru, Lancar) by Multi Court Developers Sdn Bhd. The listing names MGB, so the developer does not match. |
| M Minori | Mah Sing | Taman Seri Austin, Johor Bahru | Not stated | Structural work done; no date found | Not verified. Not found on TEDUH in any state. |
| Skypark Kepler | Tropicana (listing); TEDUH licence holder: Lido Waterfront Boulevard Sdn Bhd | Teluk Danga, Johor Bahru | Not stated | 2029 | Not verified. TEDUH: Lancar (on track) |
| Sunway LakeHills | Sunway Property | Taman Molek, Johor Bahru | Not stated | 2029 | Not verified. Not found on TEDUH in any state. |
| Monterra | TH Tebrau Land | Tebrau, Johor Bahru | Not stated | Phase 1 2029; full project 2030 | Not verified. TH Tebrau Land is on TEDUH for SOLARIS TEBRAU (Johor Bahru, Lancar). Monterra is not on TEDUH by name. |
| Pinegate Residency | Kimlun Land | Pasir Gudang Highway access, Pasir Gudang | 896 | 2026 (listing) | Not verified. TEDUH lists RESIDENSI PINEGATE (Johor Bahru, Lancar) by Pinegate Development Sdn Bhd. The listing names Kimlun Land and Pasir Gudang, so not matched. |
| Impian Hills Phase 7 (Plenitude) | Plenitude (Impian Hills) | Ulu Tiram, Johor Bahru | 157 (two-storey terraces) | Dec 2026 (press) | Not verified. Press report; developer not checked |
| Kaze Hill | Linbaq (per press); Far East (Ulu Tiram) on TEDUH | Ulu Tiram, Johor Bahru | Not stated | First two phases delivered (2025 press report) | Not verified. Developer names conflict; later phases not checked |
| Aspira Hills (Phases 2–4) | UEM Sunrise | Gerbang Nusajaya, Iskandar Puteri | 448 (two-storey terraces) | Phases launched 2025 to 2026 | Not verified. Overview file, 9 Nov 2026 |
| Sunway Sakura Phase 2 | Sunway Property | Sunway City Iskandar Puteri | Not stated (semi-detached) | Q1 2029 (developer briefing, Q1 2026) | Not verified. Developer briefing pack (as reported) |
| The Commune (Eco Botanic 3) | EcoWorld | Eco Botanic, Iskandar Puteri | 700 (2025 release) | Not stated | Not verified. Overview file, 9 Nov 2026 |
| The Chateau II @ Eco Botanic | EcoWorld | Eco Botanic, Iskandar Puteri | Not stated | Not stated | Not verified. Overview file (press, Feb 2026) |
| Forest City (Phase 3) | Country Garden | Forest City, Iskandar Puteri | Not stated (mixed-use city) | Not stated | Not verified. Overview file; delivery by phase not checked |
| Fraser Heights Phase 2 @ Tropicana Uplands | Tropicana Corp | Gelang Patah, Iskandar Puteri | 295 (terraces) | Jul 2028 (as reported) | Not verified. Overview file, 9 Nov 2026 |
| Santai (Eco Spring) | EcoWorld | Eco Spring, Tebrau, Johor Bahru | Not stated (serviced apartments) | Not stated | Not verified. Overview file (iProperty guide, 2026) |
| Montfièld 1/2 @ Eco Spring | EcoWorld | Eco Spring, Johor Bahru | Not stated | Not stated | Not verified. EcoWorld project page (Aug 2026 progress) |
| Summera Grove @ Setia Tropika (Precinct 13) | SP Setia | Setia Tropika, Johor Bahru | 203 (two-storey terraces) | Not stated (launched 14 Mar 2026) | Not verified. Overview file, 9 Nov 2026 |
| Aurea @ Setia Eco Gardens | SP Setia | Setia Eco Gardens, Gelang Patah | Not stated | Not stated | Not verified. Overview file (on sale, Oct 2026) |
| M Tiara II | Mah Sing | Skudai, Johor Bahru | Not stated (100-acre mixed township) | Launch target Q3 2026 | Not verified. Overview file, 9 Nov 2026 |
| M Grand Minori Phase 2 | Mah Sing | Taman Pelangi, Johor Bahru | Not stated (mixed-use) | Launch Q4 2026 | Not verified. Overview file, 9 Nov 2026 |
| Coronation Square Phase 2 (mall and two residential towers) | Coronade Properties (CapitaLand) | Jalan Abdullah Ibrahim, Johor Bahru city centre | Not stated | Mall target 2029 (as reported) | Not verified. Groundbreaking 7 May 2026 (CapitaLand release) |
| Country Garden Central Park | Country Garden | Johor Bahru city centre | Not stated (three phases) | Not stated | Not verified. Overview file, 9 Nov 2026 |
| Country Garden Danga Bay | Country Garden | Danga Bay, Johor Bahru | Not stated (mixed) | Not stated | Not verified. Overview file, 9 Nov 2026 |
| Larkin integrated development | JLand (Johor Corp) with EcoWorld | Jalan Tun Abdul Razak, Larkin, Johor Bahru | Not stated (serviced apartments, retail, hotel) | Launch Q4 2026 | Not verified. Overview file, 9 Nov 2026 |
| Nasa City Phase 11A | IJM Land | Nasa City, Tebrau, Johor Bahru | Not stated (terraces) | Not stated | Not verified. IJM Land project page (press pack) |
| Sunway City Iskandar Puteri (Sunway Aviana) | Sunway Property | Sunway City Iskandar Puteri, Johor | Not stated | Not stated (brochure dated Mar 2024; no 2026 status found) | Not verified. Sunway brochure (2024); not on TEDUH by name |
| Areca Terrace Phase 4B (Bandar UDA Utama) | UDA Holdings Bhd | Bandar UDA Utama, Johor Bahru | 153 (freehold two-storey terraces) | Keys handed over 18 to 21 May 2026, ahead of schedule. All units sold (company statement) | Not verified by an official source. Reported by Berita Harian, Utusan and Sinar Harian (Jun 2026) and EdgeProp.my. Checked 10 Nov 2026 |
| Senadi Hills (Taman Bukit Senadi) | UEM Sunrise (as reported) | Taman Bukit Senadi, Iskandar Puteri | Not stated | Phase 2A target end-Q2 2025, Phase 2B end-Q4 2025 (press reports, as reported). EdgeProp lists the project as Completed | Not verified. No handover notice found. TEDUH lists SENADI HILLS and TAMAN BUKIT SENADI (Johor Bahru, Siap CCC). Checked 10 Nov 2026 |
| Residensi Mutiara Indah (Aliff Heights, Tampoi) | MBW Land Sdn Bhd (as reported) | Tampoi, Johor Bahru | 612 (freehold serviced apartments) | Completion 2026 (EdgeProp listing); 2024 (PropertyGuru bullet list). Sources conflict | Not verified. No completion certificate or handover notice found. Checked 10 Nov 2026 |
| Residensi Idaman Ria (Idaman Heights, Nusa Idaman) | Kirana Tiara Sdn Bhd (as reported) | Nusa Idaman, Iskandar Puteri | 1,256 (freehold serviced apartments) | Completion Nov to Dec 2026 (sources differ) | Not verified. PropertyGuru (Dec 2026), EdgeProp (2026), myBina (phase 1, Nov 2026). Checked 10 Nov 2026 |
| Residensi Pandan 3 (Pandan Heights) | MBW Projects Sdn Bhd, MB World Group (as reported) | Jalan Pandan, Tebrau, Johor Bahru | Not stated | Sources differ: 2023 (portal profiles), Jun 2026 (listings), Q4 2026 (MyRumahBaru) | Not verified. EdgeProp, PropertyGuru, iProperty and MyRumahBaru. Checked 10 Nov 2026 |
| Taman Gaya (Precincts 6A and 6B) | Atlantic Dynamics Sdn Bhd, Daiman Group (as reported) | Taman Gaya, Ulu Tiram, Johor Bahru | Not stated (semi-detached houses) | Target Aug 2025 (project tracker). A 6A listing gives 2025 | Not verified. MyBina project tracker and PropertyGuru listings. No handover notice found. Checked 10 Nov 2026 |
| UDA Heights (Bandar UDA Utama) | UDA Holdings Bhd | Bandar UDA Utama, Johor Bahru | Not stated | Keys to more than 70 buyers, ahead of schedule (Feb 2026, as reported) | Not verified by an official source. EdgeProp.my (Feb 2026), Bernama (13 Feb 2026) and Utusan (14 Feb 2026, project completed two months ahead of schedule). Checked 10 Nov 2026 |
| One 49 Residence | TH Tebrau Land Sdn Bhd (Teguh Harian group, as reported) | Taman Sri Amar, Johor Bahru | 1,338 (listings differ) | Completion 2024 (listings; no key-handover notice found) | Boundary: completion 2024 is before 2025. Not verified. PropertyGuru listings (latest dated 18 Aug 2026) give completion 2024. Checked 10 Nov 2026 |
Sources: listing and media pages checked on 9 Nov 2026 (EdgeProp Malaysia, PropertyGuru Malaysia, StarProperty, NST, The Star, RUMAVI). Each row is to be verified against the developer or an official source.
Before you get the keys
Feng shui for a new home starts before move-in. Items people commonly check are listed below. This is a general checklist, not a verdict on any project.
- The main door: its direction and what faces it.
- The road and the surroundings outside the block.
- The unit's layout, and where the bedroom, kitchen and toilet sit relative to the door.
- Timing of groundbreaking and move-in (we offer both date selections).
We offer home visits across Peninsular Malaysia. East Malaysia and overseas visits need a special arrangement.
FAQ
Frequently asked questions
Is this list of new homes complete?
No. It shows the candidate projects found so far. Completion dates are not yet confirmed by the developer or an official source.
Why are the dates marked as not verified?
Listings and media give different dates for the same project, and Malaysian completion dates often change. We publish a date only after it is confirmed.
Do you offer home visits in Johor Bahru?
Yes. We offer home visits across Peninsular Malaysia. East Malaysia and overseas visits need a special arrangement.
Keep reading
- New homes in Malaysia: overview
- Home feng shui visits in Skudai
- Home feng shui in Kuala Lumpur
- New homes in Danga Bay
- New homes in JB City Centre
- New homes in Tebrau
- New homes in Molek
- New homes in Teluk Danga
- New homes in Mount Austin
- New homes in Ulu Tiram
- New homes in Pasir Gudang
- New homes in Iskandar Puteri
- New homes in Skudai
BOOK A READING
Ready for your own reading?
Online Bazi reading: 60-minute video consultation, up to 10 questions and a written report.